Proping, Installation and Debugging of Jaw Crusher
Since jaw crusher vibrates a lot during working, it should be installed on the proping base of the armored concrete. The weight of the base can be 8-10 times that of the machine. The depth of the base should be deeper than that of the frozen ground. The size of the planning drawing of base refers to the relative position between main body of machine and anchor bolt of the motor. This parameters are not exactly what to follow in practice. Performed hole should be prepared when installing anchor bolt. So the hole can be used when conducting the second grouting. The height and size of the feeding groove can be decided according to the discharging mode.
In order to reduce the vibrating, rubber belt of 10mm should be used between the crusher and concrete base. Tighten the anchor bolt after the second grouting. Gradienter should be used during the process and the deviation should be less than 2mm. Exam of level of the frame is important. It can insure that single feeding will not happen due to skewing of the feeding hole and thus can avoid damage of the machine.
- Equity market “well placed” to handle tr
- Crusher machine in cement grinding plant
- Low cost crusher for recycling on site
- Ansteel restructuring with Pansteel offi
- high efficiency of YuHui cone crusher
- Nation sees chance to lower trade surplu
- South Africa joins BRIC as full member
- Government sets targets for the industry
- India eyes win-win relationship with Chi
- Qualified enterprises to get needed capi
- How to Start a Cement Mill Business
- Three methods to repair the crusher
- How our hammer crusher works?
- Ball Mill for Sale - Henan YuHui
- High Pressure Grinding Mill Technical Ad
- What factors will affect the quality of
- Three ways to increase the capacity of b
- How to do when the ball mill enter the b
- Proping, Installation and Debugging of J
- Methods and Usage of Mining